SCOPE OF WORK: The Clinton Public School District contracted Paramount Construction Group to remove, dispose of, and replace 97 aluminum windows at Clinton Jr. High School and Lovett Elementary School. Abatement of asbestos and lead paint was required at both facilities, as well as preconstruction material compatibility testing.
Additional requirements of the contract included repainting of exterior surfaces.