Project Description: PCG provided all labor, equipment, hardware and software required for installation of a new fully functioning Rauland-Borg Responder 5 Nurse Call system. The replacement had to be completed without interruption of operations to the current nurse call station areas and facility throughout the entire renovation. This project was phased by floor and work associated with that specific floor. Basement and 1st Floor combined and floors 2 – 10. To put full detail of the work each floor would require is over ten pages. In summation, the nurse communications system was installed on a unit by unit, floor by floor basis. The existing nurse call system remained operational until the new system had been completely installed.