SCOPE OF WORK: Paramount was contracted by Coca Cola to remove and reinstall broken and damaged concrete in the parking lots of their Jackson, Mississippi and Greenwood, Mississippi distribution centers. Paramount self-performed 100% of the project.
Required tasks for each parking area were the same – PCG demolished the existing concrete, excavated the existing fill material, and placed a new gravel base. Once the site work was complete, Paramount placed reinforcing bar and air-entrained, 4,000 PSI concrete over the gravel base, and installed expansion joint material and joint sealant.