SCOPE OF WORK: Paramount was contracted to install two Yazoo River Basin Levees in Silver City, Mississippi. Both levee locations first required clearing, grubbing and removal of existing crushed stone surface. Once the excavation was complete, the PCG Team moved approximately 32,000 yards of dirt embankment from a borrow pit nearly 8 miles away from the river basin.
This project also included stone topping on levees, erosion control, storm water pollution prevention, mowing, and seeding to meet the USACE specifications. Paramount succeeded in performing the project without incident and to the approval of the U. S. Army Corps of Engineers.