Brief Description Project: This project required renovations/repairs to the architectural interiors, electrical, mechanical and plumbing. The PCG team was tasked with performing all construction with a functioning operating room next to the Hybrid OR. Even though the project was complex we were able to provide complete project management and coordination to install the infrastructure requirement to the Hybrid Suite. The team also renovated and reconfigured ceilings, walls and flooring as well as medical gas piping.