Project Description: PCG designed and performed work for new 27-acre gravel lot at Nissan, Canton, MS facility. The process began with cut/fill operations to get all site dirt to grade. Once subgrade was compacted, we began fine grading. Next, we laid HDPE solid drainage pipe to meet time requirements for total cost savings. We then extended 3″ conduit for future site lighting and lime treated dirt. Last we mobilized to aggregate contractor and begin installing permanent fence.